Jump to the main content block

Taiwan Tech campuses and lands

 

Campuses
Main Campus — New Gongguan Land

 

國立臺灣科技大學公館校區及公館新校地位置圖

Map Location

 

校總區公館新校區空照圖

Aerial View

Before allocation to Taiwan Tech, this land was occupied by the Council of Agriculture staff housing, Huan Min Village, NTU, and illegal construction. The retrieval of the land is currently being handled in accordance with the schedule set by the MOE. Recovered buildings have been renovated for use as laboratories and the Industry 4.0 Implementation Center. The cultural scenes of Toad Hill were fully incorporated into Taiwan Tech land per the announcement by the Taipei City Government Department of Cultural Affairs on August 25, 2016; subsequent use of the land will be handled per the Directives on the Conservation and Management of Cultural Scenes on Toad Hill.
Main Campus (Tucheng) Outdoor Experimental Station

 

校總區土城野外試驗場使用地籍圖

Cadastral map

The Tucheng Campus is equipped with a physical fire test chamber, a high-temperature refractory furnace, a chemical laboratory, a mechanically stabilized earth retaining wall, and structural system laboratories. Some unused land is rented out to local governments and public works companies. This area has been listed by the New Taipei City Government as part of the New Taipei Justice Park Development Zone, and the New Taipei City Government is expected to alter and expand its urban plan and expropriation operations. 
Main Campus (Keelung) Slope Engineering Research and Experimental Station

 

校總區基隆坡地工程究試站平面示意圖

Floor Plan

Slope stability observation facilities have been established on this campus, and research on slope stability observation is being conducted. No other developments are ongoing at this stage. The location on a mountainside has led to safety concerns and limits the economic benefits of the campus; consequently, the abolishment of the appropriation of the land was passed at the 64th Taiwan Tech Council meeting. The Keelung City Government is currently conducting a comprehensive review and inventory of university-use land within their urban plan, and the land will be returned to the National Property Administration for management.

Hsinchu branch

Hsinchu branch

國立臺灣科技大學新竹分部位置圖

Aerial View

The Innovative R & D Center was completed and opened in 2016. Construction of the International College Building and the Advanced Industrial Cooperation Building broke ground in May of 2019, and total project investments were approximately NT $500 million. The Advanced Industrial Cooperation Building was completed in May of 2021, and the International College Building and overall project was completed in June of 2022 and included dining facilities, classrooms, and faculty and student dormitories. The campus will eventually be transformed into a general education base with an all-English teaching environment as a prototype of the 7 hectare Taiwan Tech Hsinchu Campus.

 

*These photos are for webpage creation purposes only and is not available for download by others.